LIVE STATUSTata fab past halfway·Airport ~80%·Solar 300 MW live·Rail CCEA-approvedas of Jul 2026
Home / Infrastructure, in the ground

Infrastructure, in the ground

The Activation Area's utility numbers from the DSIRDA plan and the NICDC ledger.

Water

100 MLD available, a 50 MLD pure-water treatment plant, a 10 million-litre master balancing reservoir and 82 km of pipeline, with smart metering and non-revenue water under 5%.

Power

Three 66 kV substations, 400/220 kV transmission lines of 70 km and 30 km, and 115 km of underground power duct.

Recycling and waste

A 10 MLD sewage treatment plant, a 20 MLD common effluent treatment plant, 81 km of recycled-water pipeline, a 30 TPD bio-methanation plant, incinerators and a 28-hectare integrated landfill, on a zero-discharge design.

Connectivity

The Ahmedabad-Dholera expressway (reported operational since March 2026), the CCEA-approved semi high-speed rail (Rs 20,667 crore, targeted 2030-31), and the international airport (reported ~80%, targeted late 2026).

These are the sourced Activation-Area figures from the DSIRDA Sanctioned Development Plan and the NICDC DMU report, not brochure claims.

The verification every buyer should run

Dholera is a regulated, planned region, so due diligence is specific, not generic. Before any payment on a plot, confirm five things. One, the town-planning-scheme status and the Final Plot number of the exact parcel, matched to the survey number. Two, non-agricultural status, which applies automatically to land inside an approved TP scheme but not to raw land marketed as being "in the SIR". Three, the GUJRERA registration of any plotted development, checked live on gujrera.gujarat.gov.in. Four, a clean title chain: the sale deed, the mother deed, a 30-year encumbrance certificate, the 7/12 extract and up-to-date tax receipts. Five, the promoter's actual delivery record, not its marketing. If any of these cannot be produced, treat that as the answer.

How this page is sourced

Everything on this site is held to one standard so you can trust it enough to act on. Every figure is tagged by where it comes from: green for government or official sources, amber for national or trade press, and red for broker or unverified claims, which we flag rather than repeat as fact. Every figure carries a date, because Dholera moves and a number that was right last year may not hold now. Anything framed as a future event, an opening, a first chip, a completion, stays labelled as a target until a government source confirms it happened. We do not sell plots, we do not publish invented reviews or registration numbers, and where a fact is not reliably available we say so instead of guessing. The full method and the primary sources are on the sources and methodology page.

Read the tags as a confidence meter. A green figure is something you can plan against today. An amber figure is credible but worth confirming before you build a decision on it. A red figure is a claim we are showing you so that you can recognise it, not one we stand behind. When two sources disagree, we say so and show the more authoritative one rather than averaging them into a number that is nobody's actual figure. The point of all of this is simple: you should be able to act on what you read here, and check any of it yourself, without wondering whether a number was quietly invented to make the picture look better than it is.